logo vrs

Our Project

Waste Water Treatment Plant PLTU PT Sumber Segara Primadaya

Panel control automation for Waste Water Treatment Plant (WWTP) PLTU PT Sumber Segara Primadaya (S2p) – Cilacap -Jawa Tengah

  • Control Using PLC Allen Bradley Micro 870
  • Supervisory Control And Data Acquistion (SCADA) for control and monitoring using Wonderware Intouch Edge
  • Power Meter Schneider PM2120
  • Tank level control using level switch
  • Flow Transmitter by GF+ Signet (Georg Fischer Singet)
Scroll to Top